Support Board
Date/Time: Wed, 01 Jan 2025 12:39:07 +0000
Post From: Draw Profile Tool Error
[2016-05-14 12:13:32] |
User787778 - Posts: 142 |
I have created a single Volume Profile Study collection, and saved this, with Prompt to Remove Existing Studies, and called it "Entry". If I open "Entry", using the "Analysis" tab, the Volume Graph Period is correctly set to "From start time to End". I then, via the tool configuration, "draw volume profile" , set the "Chart Study Collection" to "Entry". When I use the "Draw Profile from a tool drop down menu, the "Volume Graph Period" has changed to "From start date time to End date time". I have deleted the study collections and recreated them, but still get the same result. Please note that I am using replay. |