Support Board
Date/Time: Mon, 25 Nov 2024 10:38:47 +0000
Post From: Add Subgraph Studies to a study / customize existing study
[2024-03-15 13:28:43] |
John - SC Support - Posts: 36238 |
The only way to solve this is to remove the existing studies from the chart prior to adding the Study Collection. You can save the existing studies to another Study Collection and then reload it after the other one is loaded (assuming there are no references within those studies to each other). Refer to the following: Study Collections: Adding a Study Collection Without Clearing Existing Studies On The Chart (Prompt to Remove Existing Studies) For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |