Support Board
Date/Time: Fri, 24 Jan 2025 21:18:46 +0000
Post From: Renko Chart / Ray Lines, Parallel Lines Misplaced
[2019-01-24 21:44:37] |
Sierra Chart Engineering - Posts: 104368 |
This could very well be normal because those are variable timeframe bars. Assuming the drawing in the destination is actually a copied drawing and there is no problem with the timestamps.
Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing |