Login Page - Create Account

Support Board


Date/Time: Mon, 20 Jan 2025 04:04:00 +0000



Post From: UseTool drawing and duplicating chart

[2018-05-21 13:55:39]
@sstfrederik - Posts: 405
Hi SC Engineering,

In some custom study I draw something on a chart with UseTool and set AddAsUserDrawnDrawing to true. When the chart with this study is duplicated I end up with two userdrawings on that chart. This is happening because the LineNumber for that study starts as zero on the new chart so the study draws a new drawing, and the original drawing is duplicated in the chart duplication process. The result is that I lose control of the duplicated drawing and this drawing also remains visible when the study is removed.

Any tips to manage this?

Kind regards,
Frederik