I believe the Vertical Grid Lines need to be shifted one bar to the right.

Example
With the Vertical Grid Lines set to 10-bars and using 1-minute data and the bar numbering study to count every bar
you can clearly see the following:

The first segment of the day has 9 bars labeled 1 thru 9.
The second and subsequent segments have 10 bars labeled 0 thru 9.

By shifting the Grid Lines one bar to the right, every segment will have 10 bars labeled 1 thru 10.