Support Board
Date/Time: Sun, 24 Nov 2024 01:12:48 +0000
volume value area lines
View Count: 177
[2024-07-16 15:59:23] |
Boris Libman - Posts: 58 |
I'm looking to add 5 day composite VA and POC to a chart (t-5 through t-1, not including current day). I've read (and re-read) the settings and believe I'm getting the wrong output on the chart. settings in attached file, what am I getting wrong?
|
Screenshot 2024-07-16 114649.jpg / V - Attached On 2024-07-16 15:59:18 UTC - Size: 102.44 KB - 45 views |
[2024-07-16 17:48:17] |
John - SC Support - Posts: 36238 |
The reason you are not getting what you expect is that when you reference periods back, it is the number of periods that are set by the "Time Period Type/Length". Since you are looking for a 5 day period, looking back 1 period would look back the period that started 10 days prior and when to the 6 prior day (i.e. days 6 through 10). 5 periods prior would be days 21-25. The only way to do this would be to use the "Volume by Price" study and set the Input for "Volume Graph Period Type" to "From Start Date-Time + Fixed Time Length" or "From Start Date-Time to End Date-Time". This way you can set the particular start and end for the period you want to cover. Refer to the following: Volume By Price Study: From Start Date-Time + Fixed Time Length This also means you would have to update that date each new day to move things forward by 1 day. For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
[2024-07-16 18:00:47] |
Boris Libman - Posts: 58 |
does that mean that if I use this study and can set lookback period to 0 rather than 1it would give me 6 days t-5 thru t-0 (current day)?
|
[2024-07-16 18:12:26] |
Boris Libman - Posts: 58 |
you're saying there isn't a dynamic setting for having a multiday composite profile without manually changing a hard coded start/end dates?
|
[2024-07-16 19:27:12] |
John - SC Support - Posts: 36238 |
Since you are wanting 5 days, but not the current day, the only option is to hard-code the dates into the Volume by Price Study.
For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
[2024-07-16 19:59:30] |
Boris Libman - Posts: 58 |
what would I need for settings for 5 days including current day?
|
[2024-07-16 20:45:54] |
John - SC Support - Posts: 36238 |
what would I need for settings for 5 days including current day?
In this case, you could set the "Volume Graph Period Type" to "One Period at End of Fixed Time Length - Auto Skip Empty Days". Refer to the following: Volume By Price Study: One Period at End of Fixed Time Length - Auto-Skip Empty Days Then set the following: - Time Period for Fixed Time: Days - Time Period Length for Fixed Time: 5 For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: