Support Board
Date/Time: Sat, 23 Nov 2024 01:53:06 +0000
Bar Settings
View Count: 93
[2024-09-12 18:24:12] |
User344243 - Posts: 1 |
Hello, I have an ES chart that is set for 4000 volume bars/footprint chart. I also have a CL volume chart that I want set to 2000 volume bars? When I change on the other changes to the same setting, how can I make them independent from one another? Thanks |
[2024-09-12 20:01:09] |
John - SC Support - Posts: 36238 |
You either have the charts linked or you are using a study that references the other chart and requires that the bars be the same. Refer to the following: Chart Settings: Linking Unable to Change the Bar Time Period for Charts: Chart Being Referenced by Another Chart Preventing Bar Time Period Change For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: