Support Board
Date/Time: Tue, 26 Nov 2024 06:54:12 +0000
Manage chart drawing
View Count: 254
[2023-12-21 19:54:29] |
DLi - Posts: 16 |
Dear Sierra Team, I do not think the following question / request has been asked previously. My apologies in advance if this has been asked before. I like to chart based on different time frame. For example, I would have a monthly chart (chart 1), weekly chart (chart 2). In this case, I have copied the drawing (levels) from charts 1 to chart 2. However, when I am on chart 2 (weekly chart), and I open Manage Chart Drawing, I notice the drawings (levels) details from chart 1 are still showing up. Is there anyway to auto hide the drawings (levels) from chart 1 when I’m viewing the Manage Chart Drawing info? Of course, I would still like the drawings from Chart 1 to be copied to chart 2. Thank you in advance! |
[2023-12-21 21:00:46] |
John - SC Support - Posts: 36286 |
Drawings that are copied from another chart do not show in the Manage Chart Drawings window for the chart which they are copied to. Please duplicate the destination chart, the open the "Manage Chart Drawings" window and select the "Select All" option at the top and then select the "Delete" button at the bottom. This will remove all drawings from the chart that are not copied. Then please let us know if you are still able to see the copied drawings from the original chart still on this chart or not. For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: