Support Board
Date/Time: Sat, 15 Mar 2025 22:53:21 +0000
ASCIL Performance: multiple indicators in 1 study, or split them over multiple studies?
View Count: 344
[2022-08-03 10:11:46] |
BenjFlame - Posts: 335 |
Hi, performance wise, is there any advantage of splitting several indicators into multiple studies, or have a single study with multiple indicators? Example: Is it better to have 4 studies each with 1 indicator, or it makes no difference to have 1 study with those 4 indicators? Date Time Of Last Edit: 2022-08-03 10:25:59
|
[2022-08-03 13:07:03] |
Sierra_Chart Engineering - Posts: 18793 |
This is not going to make any practical difference. Either way.
Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: