Support Board
Date/Time: Tue, 14 Jan 2025 22:36:30 +0000
Did Copy Chart Drawings From Chart # Change in Recent Versions?
View Count: 730
[2017-05-24 04:43:42] |
cmet - Posts: 580 |
Just updated to 1558 and it used to be that when you chose drawings to copy from another chart, they could only be modified on the original chart. Now however, the drawings can be selected/modified on the chart they are being copied to. I use a chart to plot levels at regular intervals. I don't want to inadvertently be able to select and change these lines. However, after the update, they are selectable and the drawings properties can be accessed and I keep accidentally selecting them and messing them up. Is there a way to "lock" drawings to a single chart so they can only be changed there (like it used to be)? |
[2017-05-24 05:51:43] |
Sierra Chart Engineering - Posts: 104368 |
Refer to: Chart Drawing Tools: Modifying and Deleting Drawing Copied to Other Charts You can disable the ability to modify copied drawings. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: