Login Page - Create Account

Support Board


Date/Time: Sun, 12 Jan 2025 18:29:27 +0000



Time Line Study

View Count: 645

[2017-03-14 21:29:16]
Crtfyd - Posts: 281
Somethings wrong with the Time Line Study.

I have several on my 1 minute main graph.

I want the same line on my "Cumulative Study" in Region 2.

So I just duplicate the study and change the region to 2.

It doesn't work. My scale wont scroll. It changes the increments. My levels aren't the same. The tools I added are reacting strangely.

I tried change to different scales (Its in "Independent" now), but nothing changes it. Also the increments.

For future versions, unless there's some way to do it now. The Vertical line tool. If that can be added to the studies , with a point in time feature. The same way the Time Line study is, but it doesn't really "note" a break at the certain time like a Vertical Time line. Mostly the Bar top/bottom seems to limit it. I can never get any other type of selection (no other choice except Line, but I assume that means Horizontal line). I find it doesn't go past the daily hi/low to easily be seen. Bottom line. The Line in Time study seems to complicate a simple Vertical Line in Time.
Thx
[2017-03-15 03:18:12]
Sierra Chart Engineering - Posts: 104368
Change the study display order so that the Time Line is below the other studies in Chart Region 2:
Chart Studies: Study Display Order
Sierra Chart Support - Engineering Level

Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy:
https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation

For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service:
Sierra Chart Teton Futures Order Routing

To post a message in this thread, you need to log in with your Sierra Chart account:

Login

Login Page - Create Account