Support Board
Date/Time: Fri, 10 Jan 2025 04:58:29 +0000
change in study collection propagation to existing charts
View Count: 788
[2016-08-20 16:52:58] |
User472677 - Posts: 356 |
Hello, Let us say 100 charts are open with the same study collection. Now study collection is modified. Does the change AUTOMATICALLY PROPAGATE TO ALL 100 CHARTS? Does it require exiting and restarting sc? If the change does not automatically propagate, is there a command or setting to make the task as time efficient as possible without manually doing it one chart at a time? |
[2016-08-21 11:49:45] |
Sierra Chart Engineering - Posts: 104368 |
You need to use the Chart Linking >> Studies option: http://www.sierrachart.com/index.php?page=doc/ChartSettings.html&CAID=#LinkNumber However, you might have a problem with Sierra Chart freezing for a period of time when changing the studies on one of the charts in the group of charts, when you have 100 charts. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2016-08-21 11:50:12
|
To post a message in this thread, you need to log in with your Sierra Chart account: