Support Board
Date/Time: Sun, 22 Dec 2024 05:24:13 +0000
How to increase look back period in spreadsheet study
View Count: 1299
[2015-06-26 19:12:14] |
User53441 - Posts: 17 |
Hello, Awhile ago I hired someone to do a custom spreadsheet study for me. It basically takes the past 60 trading days and populates the spreadsheet with info. Along with the spreadsheet study he did come chart studies that I assume is being used in order to get the info into the spreadsheet. I want to increase the look back period from 60 days to something like 180 days. How do I go about doing this? |
[2015-06-27 08:03:26] |
Sierra Chart Engineering - Posts: 104368 |
Without totally understanding the configuration,, most likely you will need to increase the Number of Rows input setting with the Spreadsheet study. This is in the Study Settings window for the Spreadsheet study. Here is documentation for this Input setting: http://www.sierrachart.com/index.php?page=doc/doc_SpreadsheetStudyInputs.html#NumberofRows Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2015-06-27 08:03:47
|
To post a message in this thread, you need to log in with your Sierra Chart account: