Login Page - Create Account

Support Board


Date/Time: Sun, 22 Dec 2024 16:01:38 +0000



Applying a study to Time and Sales

View Count: 936

[2015-06-05 11:35:29]
Leo33 - Posts: 73
When Time and Sales Volume plots, a new bar is created for each new value received.
When another study is applied to the Time and Sales Volume study, the resulting value is plotted as a bar according to the Chart Setting ie each (second/minute/trade/range/etc).

Is there a way to apply a study to a TnS study and have a bar plotted for each value of the TnS study?
[2015-06-06 00:35:06]
Sierra Chart Engineering - Posts: 104368
Yes. Use the Based On setting to base a study on another study (the Time and Sales study):
http://www.sierrachart.com/index.php?page=doc/doc_ChartStudies.html#BasedOn
Sierra Chart Support - Engineering Level

Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy:
https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation

For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service:
Sierra Chart Teton Futures Order Routing
[2015-06-06 12:29:37]
Leo33 - Posts: 73
My post title was misleading.
Say:
A chart is set to 1 sec bars from Chart Settings.
A Time and Sales Volume study applied to the chart may plot 4 bars [for 4 trades] during a single 1 sec bar of the main study [a new bar is created for each new value received by the TnS study]
If I apply another study to the Time and Sales Volume study [using Based On] the result now plots at the same rate as the main chart, a rate of 1 bar per second.
Is there a way to apply a study to a TnS study and have a bar plotted for each value of the original TnS study?

To post a message in this thread, you need to log in with your Sierra Chart account:

Login

Login Page - Create Account