Support Board
Date/Time: Fri, 29 Nov 2024 04:43:12 +0000
Post From: Setting an alert based on an overlay study from another chart
[2023-03-08 20:00:41] |
User806953 - Posts: 6 |
Hi - I promise I've probed the support boards and wasn't able to come up with an answer. I have a chart where I have macd overlaid for four separate time frames at the bottom as studies. I want it to generate an alert when the 4hr macd crosses over from either side and was able to get it set up easily on the 4hr chart by itself, but using the same syntax (tried different combinations of identifiers) am unable to get it triggered on the composite chart with all the timeframes. I've tried putting the alert on the specific 4hr study but it doesn't seem to work. Is just impossible to do due to the mismatch in bar time periods? I can live with having it just on the 4hr chart but would prefer to disable that one and have it on the main composite one as I rarely open the individual 4hr chart. Thanks!
|