Login Page - Create Account

Support Board


Date/Time: Fri, 29 Nov 2024 16:44:40 +0000



Post From: How to develop a study that runs on a different time frame than the chart it is added to?

[2023-02-02 16:56:39]
tarik medjber - Posts: 13
Hi, is there a way in custom code to develop a study to run at a different timeframe to the chart it is applied to. E.g. Study is applied to a 15min chart but in the inputs of the study, the user has set the study to calculate every 1 second, then you visually can see the study updating faster than the main charts updating (with new bars). Basically for every 15min bar, the study will develop 900 new data points (15 * 60).