Support Board
Date/Time: Sat, 15 Mar 2025 15:23:16 +0000
Post From: Update previous drawing in study when doing AutoLooping
[2022-07-11 16:43:23] |
John - SC Support - Posts: 38678 |
You have your information correct in terms of how the calculations are performed. But, this does not prevent you from updating previous information. If you are at BarIndex = 1000 and you need to change something back at BarIndex = 500, then you can just go ahead and change it. So if you need to modify a drawing then you can just update it. But, if you really need to have a full recalculation, then refer to the following variable: ACSIL Interface Members - Variables and Arrays: sc.FlagFullRecalculate For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |