Support Board
Date/Time: Fri, 28 Feb 2025 13:36:23 +0000
Post From: Update interval between 2 charts and study overlay
[2021-08-18 09:05:19] |
BenjFlame - Posts: 335 |
Hi, I have one chart that does heavy calculations with multiples subgraphs, but I don't need it updated often, so I set update to 1mn (60k ms). Now I have a dom with much faster update interval: 50ms. I have some of the plots from the source heavy chart overlaid on the dom with study overlay. Will the dom update rate being faster, force the source heavy calculation chart to update at its 50ms rate? More generally, what's the relation between source/destination charts/doms through study overlay, when it comes to update rate? Date Time Of Last Edit: 2021-08-18 09:05:30
|