Support Board
Date/Time: Mon, 03 Feb 2025 09:51:40 +0000
Post From: Zig Zag - Calculate New Values on bar close Problem
[2019-11-04 12:12:19] |
User884307 - Posts: 173 |
Due to setting (Ln28) - Calc new values on bar close to "No" results in inaccurate calculation of the zig zag waves(and also ZZ Cumulative Volume), this has been discussed previously and is an inherant faul with SC...So i was previosuly advised. Would it be possible to place in BOTH the Zig Zag Cum Volume study AND Zig Zag study a check box that allow user to simply Recalculate the chart on completion of the bar when Ln28 is set to "NO"....This would solve the problem of the inaccuracy of the wave values! Its saves having to manually keep selecting Recalculate from the dropdown (when you remember). thanks |