Support Board
Date/Time: Thu, 23 Jan 2025 03:14:49 +0000
Post From: Bug with sc.ArraySIze
[2018-10-29 21:00:07] |
Sierra Chart Engineering - Posts: 104368 |
What do you mean by "scratches the platform"? If you notice Sierra Chart freeze, then just wait until you notice it unfreeze. This would mean that there is a long time to do the calculations but there must be something else you are doing in the study function if it is taking that long. But we think we understand the basic problem. You are using a loop which is meant for manual looping. So you must set sc.AutoLoop = 0 in the SetDefaults code block at the top of the function. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2018-10-29 21:00:58
|