Support Board
Date/Time: Fri, 22 Nov 2024 06:57:24 +0000
Post From: Pivot Point - Variable Period Incorrect Output
[2013-04-10 03:16:44] |
Sierra Chart Engineering - Posts: 104368 |
There is a misunderstanding as to what the study is designed to do. The lines you show from the spreadsheet study do not even look valid and are inconsistent with how the Pivot Points-Variable Period study is designed. The Pivot Point calculation you have configured is based on an entire 3 calendar days and will be the same across those 3 days assuming all the days actually exist. Some of them are going to be weekends. We do not have any further time to spend on this. This is now marked as a user discussion. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2013-04-10 03:20:11
|