Support Board
Date/Time: Wed, 15 Jan 2025 21:15:29 +0000
Post From: High Pullback Ask/Bid Vol Diff in Number Bar Calculated Values is false in recent builds
[2017-09-05 16:32:17] |
Sierra Chart Engineering - Posts: 104368 |
We have spent some time on this and we realize the way that you are presenting this is very unclear. It looks as though you are comparing the High Pullback Ask volume Bid volume difference, to your own study. How do you know your own study is correct? We see no reason why there would be any problem with these calculations in Sierra Chart especially being you are not seeing any issue with the low pullback calculation which follows the same method as the high pullback other than resetting on a low rather than a high. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2017-09-05 16:32:52
|