Support Board
Date/Time: Wed, 15 Jan 2025 12:53:04 +0000
Post From: Tool.AddMethod Performance questions
[2017-06-15 01:15:18] |
Sierra Chart Engineering - Posts: 104368 |
All of this does make sense when you understand what is happening at a lower level. We are working on documentation for all of this. Give us a couple of days. In general, any type of AddMethod that has to search the Chart Drawing container to see if the drawing exists, is going to take longer and the larger the container is of drawings, the longer it takes. And there seems to be interaction between the study instances on the chart: For example, if I only run the fourth one: 34 ms UTAM_ADD_ALWAYS then Delete. Draw an X at the top of each bar, then Delete it before the next bar, resulting in a X at the top of the last bar only. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2017-06-15 01:15:52
|