For certain analysis I like to set my charts to "calendar days" (Mon-Sun) rather than "trading days" (Mon-Fri). This works fine on the portion of the chart with price data by checking the "Include Columns With No Data" and "Include Sat-Sun Bars For Daily Charts" check boxes on the Advanced Settings tab of the Chart Settings. However, these settings do not seem to apply to the forward space where only Mon-Fri dates are shown. The problem with this is that if I draw a trendline or other tool into the future for a projection based on calendar day spacing it will not be accurate because the time scale changes in the future bars. Would it be possible to have all dates included when these settings are checked? Is there a setting that will already do this that I am missing?