Support Board
Date/Time: Mon, 25 Nov 2024 15:00:03 +0000
Project/Extrapolate Moving Average Into the Future
View Count: 199
[2024-03-04 22:11:10] |
User688525 - Posts: 257 |
Hello Sierra Chart, Is there a study (or option) available to project/extrapolate a moving average "X" number of periods into the future? For example, if the moving average is 50 periods, can we project/extrapolate 50 periods (or 25 periods) into the future based on the analyzed date? If this is not natively supported by an existing study, can this be achieved with ACSIL? Thank you |
[2024-03-05 00:11:34] |
John - SC Support - Posts: 36244 |
It is not natively supported. And it can be done with a custom study. Refer to the following: ACSIL Interface Members - sc.Subgraph Array: sc.Subgraph[].ExtendedArrayElementsToGraph For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: