Support Board
Date/Time: Sun, 24 Nov 2024 14:56:10 +0000
how to add a study to control bar
View Count: 475
[2023-10-26 17:10:33] |
User525965 - Posts: 153 |
I'm a trying to add a study (basic sierra chart study) to the control bar, but I can't figure out how to do it,
|
[2023-10-26 17:29:36] |
John - SC Support - Posts: 36238 |
You can not add a study directly to a Control Bar. The only way to do this would be to create a Study Collection that contains the study you want, and then add that Study Collection as a Control Bar Button. Refer to the following: Control Bar: Control Bar Study Collection Buttons and Keyboard Shortcuts Make sure you are aware of the option to prompt to remove other studies for study collections. Refer to the following: Study Collections: Adding a Study Collection Without Clearing Existing Studies On The Chart (Prompt to Remove Existing Studies) For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
[2024-05-25 09:54:36] |
SafSaf - Posts: 89 |
ok, i got the control bar working and when i click on the shortcut the study appears. thank you. now i'd like to click the same button to hide the study?
|
[2024-05-27 22:05:04] |
Sierra_Chart Engineering - Posts: 17156 |
The only way to Hide a study with a Control Bar button is to create a Study Collection that does not contain the study, or has that study hidden. And then use a different Control Bar button for that Study Collection. Refer to: Control Bar: Control Bar Study Collection Buttons and Keyboard Shortcuts Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2024-05-27 22:05:12
|
To post a message in this thread, you need to log in with your Sierra Chart account: