Support Board
Date/Time: Wed, 27 Nov 2024 09:41:33 +0000
Resource problem with drawings from other charts
View Count: 247
[2023-09-07 12:32:38] |
Trader-6767 - Posts: 3 |
Dear Ladies and Gentlemen, I have noticed several times now that when I transfer drawings from e.g. M15 to another chart in Sierra Charts, the resources of the computer go up massively and a reasonable work is no longer possible. If I hide the Drawings, the resources go back to a normal level. I have noticed this now with several, different chartbooks. I have recorded a small video of the complete procedure to make this problem clear for you. In this example we are talking about 29 draws (retangles, retangles ext. with a fill (Transparency 0%)). I use the software only as a charting module, but even for that the further use doesn't make sense for me. Can you let me know a solution to the problem? Thank you very much for feedback. Best regards W. Schmidt |
Private File |
[2023-09-11 04:06:50] |
Sierra_Chart Engineering - Posts: 17191 |
Are you sure there are only 29 drawings? Check the source chart, by going to Window >> Manage Chart Drawings Window and see how many drawings there actually are. Try hiding each individual drawing and try to determine what drawing is causing a problem. Problems like this, really relate to the operating system. Not Sierra Chart. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: