Login Page - Create Account

Support Board


Date/Time: Sat, 30 Nov 2024 02:44:37 +0000



More Fine-Grained or Quick Adjustment of Days to Load Parameter

View Count: 276

[2022-12-29 17:21:59]
User3847 - Posts: 8
I would like to use one chart to view multiple bar periods. However, I'm having issues with the chart Days To Load parameter along with proportional adjustment set. Where if the bar period is 1 minute and 1 day to load, then the bar period is changed to something much larger such as 1 day, the number of days loaded is too large and the chart load time is long.

Is there a way to specify how many days to load per specific bar period?

Or is there a control bar button command to quickly set the days to load value (or select a preset, similar to a bar period command button)?

I'm looking for a faster way to adjust this than having to go to chart settings and clicking around to enter the days to load value.

Thanks!
[2022-12-29 18:24:58]
John - SC Support - Posts: 36350
There is not a built-in way to adjust the number of days related to the Bar Period.

The only option for this would be to create a Custom Study where you could create multiple Control Bar Buttons that would then set the chart as you want it to be. Refer to the information starting here:
Advanced Custom Study Interface and Language (ACSIL)
For the most reliable, advanced, and zero cost futures order routing, use the Teton service:
Sierra Chart Teton Futures Order Routing

To post a message in this thread, you need to log in with your Sierra Chart account:

Login

Login Page - Create Account