Support Board
Date/Time: Sat, 15 Mar 2025 16:12:38 +0000
Subgraph layer order
View Count: 540
[2022-07-15 19:18:06] |
BenjFlame - Posts: 335 |
Hi, If I need to have a subgraph (from ASCIL) drawn on top of another subgraph within the same study, what should I do? What controls the subgraph order? |
[2022-07-15 21:29:36] |
John - SC Support - Posts: 38678 |
The subgraphs are drawn in order from lowest number to highest (SG1, SG2, etc.). So whichever you want to be on top, needs to be the higher numbered subgraph.
For the most reliable, advanced, and zero cost futures order routing, use the Teton service: Sierra Chart Teton Futures Order Routing |
[2022-07-18 17:05:32] |
|
Yes that is the draw order and that cannot be changed. Refer to: Chart Studies: Study Display Order Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2022-07-18 17:05:43
|
To post a message in this thread, you need to log in with your Sierra Chart account: