Login Page - Create Account

Support Board


Date/Time: Thu, 06 Mar 2025 13:56:26 +0000



Study Settings Period_OHLC-Variable_Period, Skip one period forward.

View Count: 460

[2022-01-29 16:41:44]
User14953 - Posts: 243
Study Settings Period_OHLC-Variable_Period
Is it possible for the lines displayed to be Skipped or extended one additional period forward?

I want to use this feature on an intraday chart to display lines for OHLC FROM the "previous time period" (Day), TO the time period TWO time periods (Days) Forward *Instead-of or *Additional-to the default displayed OHLC lines ONE time period Forward.

Study Settings Period_OHLC-Variable_Period
Skip one period forward.
The OHLC lines for (mm/dd) date xx/04 are wanted to appear on date xx/06.
The OHLC lines for (mm/dd) date xx/05 are wanted to appear on date xx/07.
In consideration of the weekend, (Auto Skip Period of No Trading is set to Yes), then
The OHLC lines for (mm/dd) date xx/06 are wanted to appear on date xx/10.

Possible? Thank You
Previous/Period OHLC-Variable Period
[2022-01-31 16:19:34]
John - SC Support - Posts: 38425
The only way to do what you want would be to use the Spreadsheet Study and make an Absolute Reference to the data.
For the most reliable, advanced, and zero cost futures order routing, use the Teton service:
Sierra Chart Teton Futures Order Routing

To post a message in this thread, you need to log in with your Sierra Chart account:

Login

Login Page - Create Account