Support Board
Date/Time: Sat, 08 Feb 2025 23:54:02 +0000
LEVELS - Programming Question.
View Count: 586
[2020-07-27 15:53:15] |
User841604 - Posts: 20 |
Greetings, I am in the process of building an indicator which graphs only levels. A programmer I am working with tells me that each study can only graph a maximum of 60 levels, wich is the subgraph limit per study. So we would need many studys for what I want to acomplish and this does not make much sense, as I need to also do a transfill within leves to build zones and this also would require many many subgraphs... Is there a way in programming to graph many leves and zones without using lots of separate studies on a single study ? Hope I am being clear. I am trying to leave everything to the minimum expression. Many thanks |
[2020-07-27 19:40:31] |
|
There is a limit of 60 Study Subgraphs per chart study but you can also use Chart Drawings to draw lines and rectangles: Using Drawing Tools From an Advanced Custom Study Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2020-07-27 19:40:59
|
[2020-07-28 12:24:41] |
User841604 - Posts: 20 |
Thank you Sierra as always for the feedback Not sure if I am being clear... (with drawings these would be not static) as far as I can understand... I need around 250 levels fixed or active until a condition is met. Is there a way to graph them using a single study without using subgraphs ? They will all be just the same line for all the levels. |
To post a message in this thread, you need to log in with your Sierra Chart account: