Login Page - Create Account

Support Board


Date/Time: Mon, 25 Nov 2024 06:48:09 +0000



Copy Chart Drawing for Chart # ACSIL

View Count: 1368

[2014-01-09 05:46:20]
onnb - Posts: 662
The chart UI has the above option. I don't see that it exists in ACSIL.

Meaning say I do the following:
1. I open two charts.
2. On chart 1 I have a study that draws a line with AddAsUserDrawnDrawing = 1
3. On chart 2 settings defined to have drawings copied from chart 1.

Only when setting AddAsUserDrawnDrawing = 1 I'd expect it to work the same as when I do this manually.

Onn
[2014-01-12 03:15:50]
ejtrader - Posts: 688
+1 on this. Would be nice to have this done - when the drawing is done through ACSIL as well.

Thanks
[2014-01-16 03:53:27]
Sierra Chart Engineering - Posts: 104368
This is not supported. This is by design.

What you instead need to do is have your ACSIL function add the chart drawings to the specific charts that you want.

There is a s_UseTool::ChartNumber member which can be used for this purpose.
Sierra Chart Support - Engineering Level

Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy:
https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation

For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service:
Sierra Chart Teton Futures Order Routing

To post a message in this thread, you need to log in with your Sierra Chart account:

Login

Login Page - Create Account