Login Page - Create Account

Support Board


Date/Time: Mon, 25 Nov 2024 01:56:36 +0000



Regarding Speadsheet Trade and Chart Studies

View Count: 1622

[2013-12-26 14:11:27]
djcurcio - Posts: 236
It would be very helpful if the Study Title line in the spreadsheet showed the Chart Study ID Number. Especially helpful when the chart has multiple Color Bar alert studies.
Thanks.
[2013-12-26 14:45:27]
Sawtooth - Posts: 4120
If you give the study a Short Name, it will appear in row 1 on the spreadsheet, preceding the study name.
Date Time Of Last Edit: 2013-12-26 14:53:01
[2013-12-26 16:37:54]
djcurcio - Posts: 236
When I insert a short name it appears in the top line of the spreadsheet (not the second line) in front of the study name, not on the second line.
And when I insert short names on two consecutive in line studies, the subsequent (lower on the drop down list) study names become corrupted in the chart.
Thanks

[2013-12-26 17:53:06]
Sierra Chart Engineering - Posts: 104368
In the non-CLR version the studies outputted to the Spreadsheet do show the ID numbers for both the Study name and Subgraph names. It can be downloaded from here:
http://www.sierrachart.com/index.php?l=doc/download.php

This version has the new Spreadsheets that we have been working on. The spreadsheets are still under development, but should be finalized over the next month or so.

And when I insert short names on two consecutive in line studies, the subsequent (lower on the drop down list) study names become corrupted in the chart.
Provide an image of the short name you have entered and also the corruption you refer to.

Sierra Chart Support - Engineering Level

Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy:
https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation

For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service:
Sierra Chart Teton Futures Order Routing
Date Time Of Last Edit: 2013-12-26 17:53:48
[2013-12-27 10:15:02]
djcurcio - Posts: 236
Screen shots enclosed.
First is the "SC speadsht studies before" file. It shows the studies before I add the short name.
Next is the "SC Spreadsheet name added in first not second line" file. It shows that the short name got added to the first line, not the second line of the spreadsheet.
Next the third file "SC Chart Studies Settings now corrupted not color bar highlighed but Moving averages in child window" shows the corrupted names in the Chart Studies window. Notice that "Color Bar Based on alert" is selected but the Moving Averages study appears in the child window.



imageSC Chart adding short name.PNG / V - Attached On 2013-12-27 10:13:18 UTC - Size: 72.39 KB - 431 views
imageSC Chart Studies Settings now corrupted not color bar highli.PNG / V - Attached On 2013-12-27 10:13:33 UTC - Size: 112.98 KB - 427 views
imageSC speadsht studies before.PNG / V - Attached On 2013-12-27 10:13:53 UTC - Size: 99.42 KB - 478 views
imageSC Spreadsheet name added in first not second line.PNG / V - Attached On 2013-12-27 10:14:10 UTC - Size: 38.26 KB - 435 views
imageSC Spreadsheet study names before.PNG / V - Attached On 2013-12-27 10:14:35 UTC - Size: 67.44 KB - 467 views

To post a message in this thread, you need to log in with your Sierra Chart account:

Login

Login Page - Create Account