Support Board
Date/Time: Sun, 02 Feb 2025 23:14:59 +0000
[User Discussion] - Dropping zeros at the end of a decimal number
View Count: 893
[2019-10-01 18:19:18] |
ILIM KIRGIZ - Posts: 187 |
I know that Sierra does not allow me to use different value formats for each subgraph in the same study. I have a custom build study that reads horizontal lines and some other study outputs from different charts (timeframes) to create an array of sorted support and resistance levels. I watch 3 levels above the price and 3 levels below the price. I also watch distance to these levels in ticks. Levels: R1,R2,R3,S1,S2,S3 Distance to levels: DR1,DR2,DR3,DS1,DS2,DS3 (converted to tick values) and they are always integers. How can I get rid of these zeros decimal points? See attached screenshot. Do you have to show these zeros? They mean nothing and occupy a lot of screen space. Please advise. Thanks. |
Capture.PNG / V - Attached On 2019-10-01 18:19:10 UTC - Size: 253.94 KB - 304 views |
[2019-10-02 16:38:06] |
ILIM KIRGIZ - Posts: 187 |
Is there a setting for that I could not find?
|
[2019-10-02 20:07:06] |
Sierra Chart Engineering - Posts: 104368 |
This is controlled through the Value Format of the study: Chart Studies: Settings and Inputs Tab >> Value Format Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing |
[2019-10-02 20:22:42] |
ILIM KIRGIZ - Posts: 187 |
Yes, I know that and I also indicated that in my first sentence. It is not what I was asking for. I have 60 outputs in this study and I need 30 of them to be shown as integers as they occupy space on the chart header. But for the rest 30 outputs, I need it to be at this value format 0.000001 This is not controlled by the subgraph level which I need. What I need you not to show meaningless zeros. Could you please escalate this? Date Time Of Last Edit: 2019-10-02 20:25:48
|
To post a message in this thread, you need to log in with your Sierra Chart account: