Support Board
Date/Time: Fri, 24 Jan 2025 09:58:18 +0000
percent change for given time frame
View Count: 1234
[2018-09-03 16:23:36] |
User358559 - Posts: 15 |
Trying to compare percent change for a given time frame for several instruments. Some of the instruments need to have a multiplication factor so they are equalized. Currently I have each instrument charted with rate of change percentage study, then another chart with study price overlay for each Rate of change percentage study since it has a multiplier in settings/input. This works fine except, unable to change time frame comparisons, ie. 2 days,30 days etc, without having to change all charts time frames. Is there an easier way to set this up so I could change percentage change for a given time frame by just changing 1 chart. Tried price change since open and changed study input to first bar, but there is no multiplier option in order to equalize the instruments. Thank you |
[2018-09-04 03:08:01] |
Sierra Chart Engineering - Posts: 104368 |
You will want to use this particular Study: Percent Change Since Open The particular steps to do what you want are at the end of that page. We are going to add a Multiplier Input to it to accomplish what you need. This will be out in about an hour. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing |
[2019-01-14 18:16:14] |
User63632 - Posts: 43 |
With the percentage change since open study. Setting start time to first Bar of Chart and the multiplier is left @ 1 then percent change is accurate for all symbols . However if the multiplier is changed to 2 for example on 1 symbol, the percent change goes from -.13% (which is correct) to -100% and I was expecting it to be -.26%. Whatever multiplier greater than 1 or symbol used, it always goes to 100% as percent change. Any suggestions? Thank you |
To post a message in this thread, you need to log in with your Sierra Chart account: