Support Board
Date/Time: Mon, 13 Jan 2025 07:33:40 +0000
SC multithreading model
View Count: 1719
[2017-04-10 11:00:13] |
User12089 - Posts: 361 |
If a custom SC study has to perform time consuming operation like e.g. some sort of (network etc) I/O and hence not exit / return the control to SC for e.g. 1 sec or even 5 sec etc, would that slow down all other open charts run by SC where the study is not part of or it will affect only the speed of market data processing of the chart where the study is running Said in a more general way - what is the overall multithreading model of SC - every chart runs on its own independent parallel thread of execution and hence the performance of custom studies there does not affect other charts? By performance of study here I mean study busy with some sort of slow I/O - not study performing heavy duty computations which would have obvious impact on the CPU as a whole and hence all other charts, since the CPU is shared between all of them |
[2017-04-10 11:28:03] |
Sierra Chart Engineering - Posts: 104368 |
This would freeze the user interface of Sierra Chart and other charts as well.
Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing |
To post a message in this thread, you need to log in with your Sierra Chart account: