Support Board
Date/Time: Sat, 11 Jan 2025 09:04:51 +0000
Is there a way to reload chart data WITHOUT recalculating studies?
View Count: 896
[2016-11-18 17:01:07] |
skelcap - Posts: 139 |
I have a chart with custom data and a study which changes the data, so I need to reload the data after calculating the study. I tried the following but on the reload after the recalc we have sc.IsFullRecalculation == 1 to it gets stuck in an infinite loop: if (sc.IsFullRecalculation) sc.FlagToReloadChartData = 1; else sc.FlagToReloadChartData = 0; |
[2016-11-18 17:39:46] |
Sierra Chart Engineering - Posts: 104368 |
Yes this does make sense that will happen. This is normal. A recalculation obviously must take place after reloading the chart data from the file. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing |
[2016-11-18 21:59:12] |
skelcap - Posts: 139 |
Ah of course, that's the way it's supposed to happen, I was getting confused. My study was recreating my DataFile with different data which took some time, so the lag on constant recalc was noticeable. I think instead I should make the study change the symbol to reference the different data.
|
To post a message in this thread, you need to log in with your Sierra Chart account: