Support Board
Date/Time: Fri, 10 Jan 2025 09:44:19 +0000
wild character for reference to a different chart for overlay studies for a study collection
View Count: 683
[2016-08-22 02:33:46] |
User472677 - Posts: 356 |
Hello, My main chart is a 1 minute chart with a number of studies. symbol of the chart is linked to three other charts that have different time frames such as 3 minutes, 15 minutes and tick, each with its own unique studies. On the one minute chart some of the studies are overlays from other linked charts. I want to duplicate this set up of group of four charts several times. 1. Is there a way to duplicate the group or do I need to duplicate one chart at a time? 2. When I duplicate, overlay studies refer to the original symbol. Of course the duplicated group has a new symbol. Obviously I can manually change the symbol reference or chart number in overlay studies. Is there a wild character or a better way so that either by duplication or by application of study collection, overlay studies AUTOMATICALLY pick up the new symbol? Thx |
[2016-08-22 10:01:28] |
Sierra Chart Engineering - Posts: 104368 |
1. One chart at a time. 2. No. And do not ask for new features here. It is completely pointless. We have no ability to handle these. And they would have to be chargeable even if we did. The feature requests at this point are just getting ignored. Sierra Chart Support - Engineering Level Your definitive source for support. Other responses are from users. Try to keep your questions brief and to the point. Be aware of support policy: https://www.sierrachart.com/index.php?l=PostingInformation.php#GeneralInformation For the most reliable, advanced, and zero cost futures order routing, *change* to the Teton service: Sierra Chart Teton Futures Order Routing Date Time Of Last Edit: 2016-08-22 10:04:02
|
To post a message in this thread, you need to log in with your Sierra Chart account: