Support Board
Date/Time: Sat, 23 Nov 2024 07:01:10 +0000
Post From: drawing automation
[2024-09-12 13:01:50] |
Technical - Posts: 158 |
I have a question about drawings. Lets say I have a chart with a study that draws on the chart (SMA, Vwap, etc) and I put an extended rectangle on the graphic produced from the study subgraph. I do that to see it clearly and using "Copy chart drawings form other charts" want that extended rectangle to display to any chart I choose. Over time this study subgraph graphic will likely move but the rectangle will not. Is there a study or method to always have the relationship between the study subgraph and the rectangle remain constant? In other words, to have the rectangle move with the developing subgraph output. I do know I can use study overlay however the extended rectangle (size, color, text) has special meaning to my extensive prep work. I am interested it having the drawing placement be dynamic. Any thoughts? |